• Professional healthcare
  • Products & Services
  • Inspiration
  • Support & Contact
  • Shop
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
  • Consumer productsConsumer products
    • Home
    • Support
  • Healthcare professionalsHealthcare professionals
    • Home
    • Products
    • Services
    • Specialties
    • Solutions
  • Other business solutionsOther business solutions
    • Lighting
    • Automotive
    • Dictation Solutions
    • More
    • Hearing solutions
    • Display solutions
  • אודותנואודותנו
    • Home
    • חדשות
    • קשרי משקיעים
    • קריירה
    • More
    • חדשנות
    • סביבתי, חברתי וממשלתי
  • Contact and supportContact and support
    • Customer support
    • Professional healthcare support
    • Company contacts
  • Stay up-to-dateStay up-to-date
  • Select your country / languageGlobal / English
  • Privacy Notice
  • Terms of use
  • Cookie notice
© Koninklijke Philips N.V., 2004 - 2026. כל הזכויות שמורות.
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
  1. Supplies
  2. ECG
  3. Upgrade Kit 12-15/16 long leads IEC
Upgrade Kit 12-15/16 long leads IEC
Diagnostic ECG Patient Cables and Leads
ECG
‌
‌
‌
‌
‌
‌
‌
‌
‌

Upgrade Kit 12-15/16 long leads IEC

Diagnostic ECG Patient Cables and Leads
ECG
Long Upgrade Kit banana posts shielded 12-15/16 leads IEC color coded for pageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m)), 6 shorting plugs, 2 lead separators 3.4 diameter, 4 banana post adapters, 6 colored rings, 4 white base rings and instructions for use. The long additions lead sets come pre-assembled with the white base ring and the banana post adapters. 1 kit = 1 sales unit.

For all support resources and contact information, visit our Support hub.

Brochure
Enhancing ECG quality application note(312.73 KB)
See all
Specifications
  • ECG Diagnostic ECG Patient Cables and Leads
    Patient Application
    Child; Adult
    Application Site
    Limb; Chest
    Lead Set Length
    48 in (1.22m)
    Number of Leads
    16
    Shielded
    Shielded
    Electrode Attachment Method
    Alligator Clip
    Color Coding
    IEC
  • Product details
    Use with Non-Philips Healthcare Equipment
    No
    Product Category
    ECG
    Use with Philips Healthcare Equipment
    860315, 860310
    Product Type
    Diagnostic ECG Patient Cables and Leads
    CE Certified
    Yes
    Single-Patient Use OR Multi-Patient Use
    Multi-Patient Use
    Packaging Unit
    1
    Not manufactured with natural rubber latex
    Yes
    Sterile OR Non-Sterile
    Non-Sterile
    Minimum Shelf Life
    None
    Use with Other Supplies
    N/A

Documentation

Enhancing ECG quality application note
PDF|312.73 KB
Disclaimer
Product may not be available in all geographies, please check with your Philips representative for complete portfolio availability.